Skip to content
MONTEGRE

EU delays methane reporting rules for energy importers by two years

EU negotiators postponed methane monitoring and reporting obligations for oil, gas and coal importers until 2029 and 2030.

Sources: The European Sting, EUobserver, Săptămâna Financiară3 sources ↓|· 2 min read
EU delays methane reporting rules for energy importers by two years
Photo: The European Sting

KEY POINTS

  • EU governments and Parliament agreed a two-year delay for methane rules on energy importers
  • Importers must prove equivalent monitoring standards for contracts from May 2030
  • Methane intensity reporting is moved from August 2029 to August 2030
  • The Commission will review implementation by January 2028 and any further delay needs a new law
  • Campaigners warn 24 billion cubic metres of methane will leak during the extra delay

EU governments and the European Parliament reached a provisional agreement in the early hours of 19 November to delay methane monitoring and reporting rules for oil, gas and coal importers by two years. The delay is twice as long as the one-year postponement originally proposed by the European Commission.

Under the deal, importers will have until May 2030 to prove that supply contracts concluded or renewed since 4 August 2024 cover only fuel subject to monitoring, reporting and verification measures equivalent to EU rules. The same deadline applies when importers report on efforts to bring older contracts into line.

“Despite the delay, the integrity of the regulation is preserved in the final deal”

— Léa Pilsner of Environmental Defense Fund Europe

EU producers and importers must now report the methane intensity of fossil fuels sold in the EU market by 5 August 2030, instead of the originally planned date of 5 August 2029. EU oil and gas operators will have until 5 February 2029 to submit verified reports for operated assets, and until 5 August 2030 for non-operated assets.

The Commission will review implementation and security of supply by 1 January 2028 and every five years thereafter. Any further delay would require a whole new methane law, ruling out the option pushed by member states to extend the delay again.

Governments said the delay was needed because of supply risks and concerns over high fuel prices after the US-Israeli war on Iran disrupted Gulf oil and gas supplies. Methane traps around 80 times more heat than carbon dioxide over 20 years, and much of it leaks from wells, pipelines and coal mines.

Léa Pilsner of Environmental Defense Fund Europe said the integrity of the regulation is preserved in the final deal. She added that governments had bought themselves two years the regulation never needed, and that 24 billion cubic metres of methane will leak into the atmosphere during the extra two-year delay.

COMMENTS (0)

0/2000

No comments yet. Be the first.

RELATED STORIES

This page was compiled with AI assistance from the outlets named above and passed an automated language check before publication. Montegre has no reporters of its own; the byline names the outlets the story was compiled from. Method and editorial standards