Testing begins on Bursa high-speed rail line, Ankara trip to take 2 hours 15 minutes
Transport Minister Abdulkadir Uraloglu said the Osmaneli-Bursa section has completed infrastructure and superstructure work and entered the testing phase.

KEY POINTS
- Infrastructure and superstructure work on the Osmaneli-Bursa section is complete
- Testing and certification are underway before the line enters service
- Travel time between Bursa and Ankara or Istanbul will drop to 2 hours 15 minutes
- The overall project is 83.08 percent physically complete
Transport and Infrastructure Minister Abdulkadir Uraloglu announced that infrastructure and superstructure work on the Osmaneli-Bursa section has been completed and testing has begun. He said the line will connect Bursa directly to Turkey's high-speed rail network once testing and certification are finished.
Testing is proceeding in stages. Static catenary measurements and track geometry measurements were completed in September and October, while signaling power system tests started in October.
“We will make our line ready for operation with tests.”
Catenary hot run tests were carried out this month, and dynamic acceleration tests and dynamic catenary measurements will also be conducted. Future stages will include signaling concordance tests, European Train Control System (ETCS) tests, and GSM-R railway mobile communication system tests.
Integration checks between the Osmaneli-Bursa line and the existing Ankara-Istanbul high-speed line will also be performed. The minister emphasized that comprehensive checks are necessary to put the line into safe operation.
Once completed, the line will link Bursa directly to the Ankara-Istanbul high-speed line via Osmaneli. Travel times between Bursa-Ankara and Bursa-Istanbul are expected to fall to 2 hours and 15 minutes.
The overall Bandırma-Bursa-Yenişehir-Osmaneli High-Speed Rail Project has achieved 83.08 percent physical progress. Construction work on the Bursa-Bandırma section is continuing, and the project will serve both passenger and freight transport.
2 more sources below
TOPICS
COMMENTS (0)
No comments yet. Be the first.
RELATED STORIES

Greek Police Recover 268 Stolen Luxury Vehicles Worth Over 5 Million Euros in International Crackdown
Greek authorities, working with FRONTEX and INTERPOL, recovered 268 stolen or tampered vehicles and a boat during two international operations.

Mullin Defends Government Jet Trip to LSU Game Amid Flight Grounding
Homeland Security Secretary Markwayne Mullin faced lawmakers over his decision to fly to an LSU football game while thousands of flights were canceled during a nationwide ground stop.

Modi to launch Rs 60,000 crore projects in Bihar on Saturday
Prime Minister Narendra Modi will inaugurate and lay foundation stones for projects worth over Rs 60,000 crore across Bihar, West Bengal and Uttar Pradesh.
- EU-UK Summit Signs Three Deals to Ease Irish Agri-Food Exports
- NYC bans horse-drawn carriages by 2028, unions sue over compensation
- Istanbul Municipality Council Approves 565 Billion Lira 2027 Budget
- Spanish train drivers cancel strike after government safety deal
- Supreme Court clears bike taxis in Karnataka, rejects state ban appeal
This page was compiled with AI assistance from the outlets named above and passed an automated language check before publication. Montegre has no reporters of its own; the byline names the outlets the story was compiled from. Method and editorial standards